Product Description
HDPE water pipe irrigation polyethylene pipe plastic tube for landfill
Pipe made of polvethylene is a cost effective solution for a broad range of piping problems in municipal, industrial.marine,mining, landifill, duct and agricultural applications. It has been tested and proven effective for above ground. surface,buried, sliplined, floating, and sub-surface marine applications. High-density polyethylene pipe (HDPE) can carry potable water,wastewater, slurrles, chemicals, hazardisous wastes, and compressed gases. Polyethylene is strong, extremely tough and very durable.
Product Parameter
Product Name |
HDPE Pipe |
Diameter (mm) |
20-800mm |
DN |
32-1200 |
|
Product Feature
Features.
1. High toughness and good seismic performance;
2. The connection is reliable;
3. Low density, light weight, easy to handle and install
4. Can resist a variety of chemical media corrosion;
5. Excellent hydraulic performance, the wear resistance coefficient is only 0.009;
6. Long service life, up to 50 years;
7. Good hygiene and environmental performance;
8. Better resistance to slow crack growth (SCG) and rapid crack propagation (RCP).
Pipe Product Process
HDPE pipe sizes are from DN32 to DN1200.
The pressure grade is between 0.6mpa and 1.6mpa, with 5 grades.
HDPE pipe in the temperature of 190 ºC n240 ºC between will be melt, using this feature, the pipe (or pipes) a good contact with both parts of the melt,And maintain the appropriate pressure, after cooling the two can be firmly integrated.Therefore, the connection mode of PE pipe is different from that of u-pvc pipe. Generally, the two methods are electric hot melt connection and hot melt butt joint. When DN is greater than or equal to 75, hot-melt butt joint or electric melt socket connection is adopted. Connect with different materials using flange or thread connection.
Product Application
The filtration layer of the river canal, seacoast, concrete slope, retaining walls. At the same time of preventing the clay granule from passing, it allows the water and the gas pass through freely.
The isolation of the railway dregs and the roadbed, roadbed and the soft base, surface of the airdrome and parking lot and the groundsill, different dam materials.
It isolates the soil and the gravel of two kinds different granule pathway from the groundsill or other buildings.
Related Products
Why Choose Us


We for environmental protection and civil engineering provides a large number of excellent geotechnical material, is now in the service of the United Kingdom, Israel, America, Australia, New Zealand, Indonesia, the Philippines, Thailand, and so on more than 60 countries, Shandong into geomembrane products with excellent quality and perfect technical service, won the widespread praise in the international market.
Our quality satisfy the ASTM GRI-GM13 standard
Our company has more than 20 years of industry experience, has obtained ISO9001, ISO45001 and ISO14001 certificates, product production meets the ISO quality management system.
FAQ
.Q: Are you trading company or manufacturer?
A:We are factory.
Q: Is the quality of your products stable?
A:The company has a complete QC system, and each batch of products will be sampled and the samples will be kept for 5 years.
Q: Can you do OEM?
A: Yes, of course. We can produce the products exactly as your request.
Q: Do you provide samples ? Is it free or extra?
A: Yes, we offer the sample for free but do not pay the cost of freight.
Q: How long does your delivery take?
A: Generally it takes 5-10 days if the goods are in stock;Otherwise it will take 10-15 days (of course, it depends on quantity at the same time).
Q: What is your terms of payment?
A: Payment<=5000USD, 100% in advance. Payment>=5000USD, 30% T/T in advance, balance before shipment.
If you have any other questions, please feel free to contact us at any time.